Industries · Electrical & Mechanical Engineering

Electrical and mechanical engineering work runs on documentation.

Drawing revisions, datasheets, compliance certificates, equipment schedules. The engineering itself moves fast, but the paperwork behind it rarely does.

The paperwork behind every project
  • Drawing revisions
  • Datasheets
  • Compliance certificates
  • Equipment schedules

Most teams lose hours every week just keeping documentation aligned with what has actually changed on the project.

LAI Solutions builds AI systems for electrical and mechanical engineering teams in Western Australia that close that gap, working inside the tools your team already uses. For teams managing constant drawing revisions, this often comes down to engineering drawing management: keeping the current version findable and trusted without a manual cross check every time.

The problem

Where the time goes on electrical and mechanical projects

Our own research puts engineering and construction admin at 17 hours a week per person. On electrical and mechanical projects, that time concentrates around three points: setting up a new project from scratch, keeping drawing and datasheet revisions current across every stakeholder, and assembling the compliance documentation a project needs before handover.

17hrs

Admin per person, every week, across engineering and construction teams (LAI Solutions research).

Project setup

Project setup is often the worst of the three. A new project usually means rebuilding folder structures, revision logs and document registers that already exist in some form from the last job, just not in a format anyone can reuse quickly.

Datasheet management

Datasheet management carries a quieter cost. On a project with dozens of equipment items, keeping the current datasheet matched to the current specification is a manual cross checking exercise that falls apart the moment two people update different copies at the same time.

Compliance before handover

Nobody notices until a compliance review flags the mismatch, and by then the fix takes longer than the original error would have.

The approach

What AI automation actually means for an electrical and mechanical engineering team

AI automation, in the context LAI builds for, is not a new drawing management platform and not another portal engineers have to check. It connects to the systems an electrical or mechanical team already runs, reads what is changing inside them, and handles the repetitive work of keeping documentation aligned with the engineering.

On an electrical or mechanical project, that usually means three things working together.

1

Update as usual

A drawing or datasheet gets updated the way it always has.

2

Revisions tracked

An automated layer tracks the revision and flags anyone still working from an older version.

3

Compliance assembled

The compliance documentation a handover needs gets assembled from the same underlying records automatically.

Nobody has to learn a new tool to make this work, and nobody has to manually cross check which version is current.

Not new engineering software

This is a different approach from adopting new engineering software. Software asks a team to change where they work. Automation changes what happens to the documentation a team is already producing.

Not just a document management system

It is also a different approach from a document management system on its own. A document management system gives a team somewhere to store files correctly. It does not notice when a datasheet falls out of sync with a drawing, or chase the person who forgot to update the register. That is the part LAI automates, on top of whatever storage system is already in place.

What we build

What LAI builds for electrical and mechanical engineering teams

We build inside the systems your team already runs. Nobody learns new software, and nothing about how your engineers work day to day needs to change for the automation to work.

Project setup automation

New projects launch with the folder structure, document register and revision tracking already in place, drawing on what worked on the last job instead of starting from a blank template every time.

Engineering drawing management

Revisions, datasheets and technical documents stay version controlled and easy to find, so nobody is working from an outdated drawing because the current one is buried three folders deep in someone’s inbox.

Compliance and reporting

Compliance documentation and project reporting get assembled from data that already exists in your systems, rather than compiled manually before every handover or audit.

Where a project calls for AI tools directly in the workflow, we connect the systems you use, including ChatGPT or Claude, without forcing a switch to a new platform.

Implementation

How implementation actually works

Most engagements start with a short discovery conversation looking at where an electrical or mechanical team’s time is actually going, not a sales pitch. From there, LAI maps the project setup process, the drawing and datasheet workflow, or the compliance reporting cycle that is costing the most time, and builds the automation layer on top of the systems already in place.

Because nothing is being replaced, an engineering team does not lose weeks to a rollout or retraining. Results tend to show up in weeks rather than months, and engineers can keep working through the entire process without a pause in active projects.

Who we are

Engineers first, technology second

Two members of our team spent years inside Fortescue Metals Group and Mineral Resources before founding LAI. That means we already understand the difference between a drawing revision and a design change, and why an M and E team treats compliance documentation as non negotiable. We are not learning your industry on your dollar.

That background shapes how we build. A system that looks clean in a demo but breaks the first time a technical document gets uploaded in a format nobody planned for is not a system we would ship, and it is not one we ask engineering teams to adopt. Every build gets tested against how documentation actually moves on a live project, not how it moves in a product demonstration.

Fortescue Metals GroupMineral Resources

Proof

Results teams can check

70%Less project setup time

McGill Engineering

McGill Engineering reduced project setup time by 70% after automating the parts of the process that used to eat the first week of every job. The result held up project after project, not just once under ideal conditions.

Read the full breakdown in our case studies.

Start with a conversation, not a proposal

Most engagements start with 30 minutes looking at where your team’s time actually goes, not a sales pitch. If there is a clear case for automation, we will say so. If there is not, we will say that too.

Talk to us about your project