A subcontractor payment request sits in an inbox for four days before anyone notices it still needs a second signature. A change order goes out for approval on a Friday and doesn’t get looked at until the following Wednesday, because the person who needs to sign it was on site all week and nobody flagged it as urgent. Multiply that across every request moving through a project at once, and the delay stops being an inconvenience. It becomes the reason a schedule slips.
None of that shows up as one big failure. It shows up as weeks quietly disappearing across a project, one stalled sign off at a time, until someone adds it up at the end of a job and realises how much of the delay was never actually about the work.
What Actually Causes the Bottleneck
Three things tend to be true on a project where approvals are the problem, not the work itself.
- Sign off happens one person at a time with no visibility into where a request currently sits.
- Every request routes to the same person regardless of value or urgency, so a five thousand dollar variation waits behind a five hundred thousand dollar one.
- There is no escalation path when the approver is on site, on leave, or simply hasn’t gotten to it yet.
This tends to matter most on projects running several subcontractors at once, since each one is waiting on a different approval to release payment, order materials, or start the next trade. A single slow sign off doesn’t just delay one task. It can hold up everyone downstream of it, and subcontractors remember which projects pay and approve on time when they’re deciding what to prioritise next.
None of that requires a system failure to become a real problem. It just requires enough requests moving through the same manual chain that the small gaps start compounding into weeks.
There’s a second cost that’s easy to miss until it turns into a dispute. When a subcontractor claims a variation was verbally approved and there’s no record of when, or by whom, that argument tends to get resolved in favour of whoever has the better paper trail. Slow approvals and undocumented approvals are usually the same problem wearing two different hats.
Why the Usual Fix Doesn’t Fit
Most approval software assumes the fix is moving the whole process onto a new platform. For a construction operation, that assumption doesn’t hold up well. Approval chains here are project specific and value specific in ways generic approval tools were never built for, and migrating an entire operation’s sign off logic into a new system is its own multi month project. Every routing rule, every exception, every unwritten habit like “this always goes to the site manager first, except anything to do with safety” has to be rebuilt from scratch in someone else’s system before it does anything useful. That rebuild is usually where these projects actually stall, not in choosing which platform to buy. It’s the same kind of delay this problem is supposed to be solving, just moved earlier and dressed up as a fix.
What a Working Approval Workflow Actually Looks Like
A working version of this doesn’t ask anyone to change platforms or learn a new process. It routes requests by project, value or type instead of sending everything to one queue, so a minor variation and a major one don’t compete for the same person’s attention. It runs approvers in sequence where the request genuinely needs one sign off before the next, and in parallel where it doesn’t, instead of defaulting to sequential because that’s how it’s always been done. When an approver is away, the request moves to a nominated substitute automatically rather than sitting untouched. And every decision is timestamped as it happens, so proving who approved what, and when, doesn’t mean reconstructing it from memory a month later.
None of this requires guessing at rules from scratch, either. Most operations already know their thresholds even if nobody’s written them down. A certain dollar amount needs two sign offs. Anything touching safety skips the normal queue entirely. Work on a particular client’s site goes to a named person first, no exceptions. The work is capturing that logic accurately, not inventing new policy on top of it.
What the Shift Actually Delivers
Tools like ChatGPT, Claude and Copilot do the actual reading and routing behind this, checking a request against the right rule and moving it on, rather than a person doing that check manually every time a request comes in.
SMS Group is a useful example of what that shift looks like in practice. Approval time dropped by 75 percent once sign off stopped depending on a single sequential chain and started routing to the right person automatically, based on the rule the request actually needed rather than habit. That’s not a marginal gain built up over months. It’s the difference between a request sitting until someone remembers it and a request finding the right person the same day it’s raised.
This is the same thinking behind LAI’s approval workflow automation, built around how a project’s approval logic actually works rather than replacing it with someone else’s template. It sits alongside the same problem from the document side covered in LAI’s document workflow automation work, since a stalled approval and a lost document version are usually two symptoms of the same underlying gap.
None of this is really about speed for its own sake. A faster approval only matters because of what’s waiting on the other side of it, a crew that can’t start, a supplier that won’t release materials without a signed order, a subcontractor deciding whether this project is worth prioritising next time. Fixing the bottleneck fixes those knock-on effects too, which is usually where the real cost was sitting all along.
Weeks lost to approvals rarely get noticed until a schedule slips and someone asks why. By then, the honest answer is usually that no single request took that long. A dozen small ones did, one inbox at a time, and the schedule paid for all of them at once.